Archives

Isabella County Jail and Sheriff’s Office

This project encompassed the construction of a 151-bed county jail facility, coupled with a Sheriff’s office, to serve as a cornerstone of the local justice system. Located on a previously undeveloped greenfield site in Mt. Pleasant, the endeavor demanded extensive infrastructure additions, including the extension of water, sewer, and primary electrical services, along with the […]

Flint Public Library

This project entailed extensive renovations to the existing three-story steel framed structure.  The renovation included:  new roofing, windows, exterior facade and complete site improvement and infrastructure improvements and structural steel reinforcements. Updates included: Expand Children’s Area Create Tween/Teen Space Maintain Quiet Zone for Study/Work Space Create space that can be opened and closed based on […]

Great Lakes Water Authority – Springwells Water Treatment Plant Medium Voltage Electrical System

The Great Lakes Water Authority (GLWA) awarded Clark Construction Company a $65 million-dollar lump sum contract to replace existing 4800V medium voltage electrical system and construct various civil site, architectural, structural, building mechanical, plumbing, electrical and control system improvements at the Springwells Water Treatment Plant. The Plant is located in the city of Dearborn and […]

Great Lakes Water Authority – 96” Water Transmission Main Relocation – Phase II

The Joint Venture Team of Clark Construction and Ric-Man Inc. was awarded a $56.4 million lump sum contract to construct two miles of 96-inch diameter freshwater transmission main along Dequindre Road, in the city of Rochester Hills. This project represents the second of four phases funded by the State of Michigan Revolving Funds under a […]

Great Lakes Water Authority – 14 Mile Water Transmission Line

The Great Lakes Water Authority awarded the Ric-Man|Clark Joint Venture the $93-million installation of an 8-mile long, 54-inch diameter freshwater pipeline to provide a transmission main loop to their existing 14 mile system. The project increased redundancy on this branch of the system and provided a fill line to the existing Haggerty Reservoir. Installation of […]

Brighton Area Schools 2019 Bond Program

The bond initiative brings about a range of improvements across the district, including STEAM center expansions at all four elementary schools, alongside upgraded STEAM facilities at Maltby Intermediate School and Scranton Middle School. Technological enhancements introduce wireless networks, new computers, interactive classroom tools, and multimedia presentation technologies, bolstering security measures throughout. Athletic infrastructure has undergone […]

Greater Midland Community Center

The Greater Midland Community Center includes a new 120,000 sf Recreation Center constructed on the existing Midland Community Center property. The new building replaces the 65-year old structure that remained open while the new building was completed. While the previous facility — measuring about 240,000 sf — was larger, the new site was designed with […]

Fitzgerald Public Schools 2019 Bond Program

The bond program encompassed improvements across multiple educational facilities, including three elementary schools, a middle school, and a high school. The comprehensive scope of work included various enhancements aimed at safety, energy efficiency, and the overall learning environment. Moreover, security measures such as cameras, fire alarms, and window protection were enhanced. Energy efficiency was improved […]

Monroe Public Schools Bond Program

This 2020 bond program involves renovation to 11 district buildings that include improving safety and security at all school buildings and funding capital projects, including improvements to its heating, ventilation and air conditioning (HVAC). Secure entryways, new and updated restrooms, cafeteria air conditioning, fire alarm updates with new public address systems and security tie-ins, and […]

Chelsea School District 2019 Bond Program

This multi-phase bond program will include Building System Improvements, Technology Improvements and Site Improvements within the district’s 10 facilities. These include (3) elementary schools, middle school, high school, Washington Street Education Center(4) and the Transportation Center. 2020: • Phase 2 of Building 500 for STEAM labs, healthcare lab, additional restrooms. Replacement of 2 parking Lots. […]