Archives

Mackinac Straits Health System – Medical Office Building

This facility expanded the Mackinac Straits Health System campus to improve access to care while easing demand on the existing hospital. The new Medical Office Building includes exam rooms, offices, and support areas for primary, dental, optical, and behavioral health services, all built adjacent to active facilities to maintain uninterrupted operations.

Corewell Health – Clarkston Family Medicine + OBGYN

This tenant fit-out transformed a third-floor shell space into a modern Family Medicine and OBGYN clinic featuring 15 primary care exam rooms, 13 obstetrics exam rooms, two procedure rooms, two ultrasound rooms, a laboratory, physician offices, and a welcoming reception area. All MEP and sanitary tie-ins were carefully coordinated with building facilities to avoid disruption to active dialysis suites […]

Michigan State University Multicultural Center

Clark Construction Company, in joint venture with White Construction, partnered with Michigan State University to deliver the Multicultural Center—a student-driven space designed to foster connection, cultural expression, and belonging. Located at the prominent intersection of Farm Lane and Shaw Lane, the 32,000-square-foot facility was shaped through direct student involvement from visioning through construction. The building […]

Gun Lake Casino Hotel – Phase 5 Hotel and Aqua Dome

Clark successfully delivered the fifth phase of expansion at Gun Lake Casino, continuing a long-standing partnership that has included multiple additions and renovations. This milestone project introduced a striking 15-story, Four Diamond hotel and a one-of-a-kind glass-domed entertainment destination known as the Aquadome. The hotel features 250 luxurious guest rooms, a 175-seat restaurant, a full-service […]

Isabella County Jail and Sheriff’s Office

This project encompassed the construction of a 151-bed county jail facility, coupled with a Sheriff’s office, to serve as a cornerstone of the local justice system. Located on a previously undeveloped greenfield site in Mt. Pleasant, the endeavor demanded extensive infrastructure additions, including the extension of water, sewer, and primary electrical services, along with the […]

Flint Public Library

This project entailed extensive renovations to the existing three-story steel framed structure.  The renovation included:  new roofing, windows, exterior facade and complete site improvement and infrastructure improvements and structural steel reinforcements. Updates included: Expand Children’s Area Create Tween/Teen Space Maintain Quiet Zone for Study/Work Space Create space that can be opened and closed based on […]

Great Lakes Water Authority – Springwells Water Treatment Plant Medium Voltage Electrical System

The Great Lakes Water Authority (GLWA) awarded Clark Construction Company a $65 million-dollar lump sum contract to replace existing 4800V medium voltage electrical system and construct various civil site, architectural, structural, building mechanical, plumbing, electrical and control system improvements at the Springwells Water Treatment Plant. The Plant is located in the city of Dearborn and […]

Great Lakes Water Authority – 96” Water Transmission Main Relocation – Phase II

The Joint Venture Team of Clark Construction and Ric-Man Inc. was awarded a $56.4 million lump sum contract to construct two miles of 96-inch diameter freshwater transmission main along Dequindre Road, in the city of Rochester Hills. This project represents the second of four phases funded by the State of Michigan Revolving Funds under a […]

Great Lakes Water Authority – 14 Mile Water Transmission Line

The Great Lakes Water Authority awarded the Ric-Man|Clark Joint Venture the $93-million installation of an 8-mile long, 54-inch diameter freshwater pipeline to provide a transmission main loop to their existing 14 mile system. The project increased redundancy on this branch of the system and provided a fill line to the existing Haggerty Reservoir. Installation of […]

Brighton Area Schools 2019 Bond Program

The bond initiative brings about a range of improvements across the district, including STEAM center expansions at all four elementary schools, alongside upgraded STEAM facilities at Maltby Intermediate School and Scranton Middle School. Technological enhancements introduce wireless networks, new computers, interactive classroom tools, and multimedia presentation technologies, bolstering security measures throughout. Athletic infrastructure has undergone […]