Detroit Public Schools East English Village Preparatory Academy

As part of the 2009 Bond Program, the existing Finney High School was replaced by a new 221,000 sq.ft. High School on the same site, designed to accommodate up to 1,200 students. The state-of-the-art facility boasts four wings housing eight science laboratories, an advanced media center, an athletic area featuring a community health clinic, and […]

Milan Area Schools 2009 Bond Program

The initial work required a massive amount of construction completed during the 2010 summer break.  The balance of construction was complete by September, 2011.  Scope of work included: Symons Elementary School – Replaced roofing and windows, renovated staff and student toilet rooms, replaced fire alarm system, replaced mechanical/electrical equipment and installed technology infrastructure. Paddock Elementary Schools – Replaced heating and […]

Greenville Public Schools

Clark Construction provided pre-bond assistance to the Citizens’ Committee and District Administration for their 2011 bond program. Scope of work for the construction phase included: Elementary Buildings Improved site safety, circulation and parking Building security improvements Wireless connectivity technology Building entry improvements Carpet replacement with asbestos removal Installation of air conditioning at one location Greenville […]

Grand Ledge Public Schools

Renovation and upgrades at 10 separate district buildings; scope of work included: District wide replacement and upgrade of existing heating, cooling and ventilation systems Multiple chiller installations Modification of existing AHUs and conversion from DX to chilled glycol systems Boiler installation and replacement of fin tube and modular type systems Conversion of existing BMS to […]

Alma High School

High School upgrades and renovations including: Storage room addition Remodel pool area Science labs Auditorium Toilet rooms Kitchen Gym bleachers Replacement of roof, windows, select ceilings, exterior entrances, PA and clock system Upgrades to security systems, mechanical units and controls, and electrical infrastructure Replace entry plaza Replace running track and visitor bleachers Clark Construction’s K-12 […]

Waverly Community Schools 2000 Bond Program

Clark was the Construction Manager for this $54 million bond program consisting of nine separate buildings as well as athletic fields. The scope of work included district-wide improvements plus some building additions including: High School 40,000 s.f. addition and complete renovation of the existing 220,000 s.f. building. Sitework improvements include renovation of the running track […]

Fowler Public Schools Bond Program

Clark Construction Company played a pivotal role as the Construction Manager for Fowler’s $2.1 million project. The project encompassed various key aspects, including additions and renovations to the Elementary School, enhancements to the High School Science Room, and the creation of a dynamic High School Media Center with modernized facilities. Additionally, the project involved the […]

Fowlerville Community Schools

High School (conversion of existing Jr. High to High School) 150,000 sq.ft. addition of classrooms, industrial arts areas, auditorium and competition gymnasium, including lobby and circulation spaces. Site circulation enhancements and renovations; site athletics improvements including fields, lighting and concession areas; equipment and technology upgrades. Jr. High School (conversion of High School to Jr. High School) […]

Howell Public Schools Howell High School Renovation

The Howell High School Renovations project encompassed a comprehensive scope of work. Notable highlights included the installation of a synthetic turf football field and the construction of a new 8,000 sq.ft. athletic team room building, complete with stadium concessions. A substantial 15,000 sq.ft. addition with a 2-story entrance was introduced, while the existing 434,947 sq.ft. […]

Durand Area Schools 2006 Bond Program

This project included the following: Bertha Neal Elementary: Parking, drainage and vehicle circulation improvements; renovations relative to ADA compliance; Mechanical, Electrical and Finish upgrades Doyle Knight Elementary: Parking, drainage and vehicle circulation improvements; renovations relative to ADA compliance; Mechanical, Electrical and Finish upgrades Robert Kerr Elementary School: Parking, drainage and vehicle circulation improvements; renovations relative […]