Archives

Harborside Office Center

Explore innovation through the construction of a 108,000 sq.ft., 4-level building, serving as SEMCO’s headquarters. The first level features a blend of tilt-up pre-cast panels, brick veneer, and curtain wall areas with piers. Rising above, the three upper floors showcase an aluminum curtain wall complemented by sleek metal panels. Inside, a strategic light shelf reflects […]

Messa Headquarters Office

Welcome to the Messa Headquarters Office in East Lansing, a testament to modern design. With five levels, each encompassing approximately 17,000 sq.ft., this structure is a marvel of workspace innovation. Luxurious finishes like wood paneling, granite tile and slab materials, and a grand two-story lobby redefine office aesthetics. A standout feature is the computer access […]

W.K. Kellogg Institute for Food & Nutrition Research

This world-class food research and development facility enables Kellogg food scientists to turn wholesome grains into innovative breakfast foods which meet consumer expectations for superior taste, nutrition and convenience. The new facility includes nine conference rooms, a board room, 120-seat auditorium, 3-story glass atrium, freestanding, stainless steel clad staircase, and state-of-the-art technology throughout. Computer access […]

Bay Harbor Office Building

Nestled in the coveted Bay Harbor Marina District along the picturesque shores of Little Traverse Bay near Petoskey, stands the Bay Harbor Office Building. Spanning 16,000 sq.ft., this architectural gem embodies elegance and prestige. Distinguished by its copper siding, a hallmark of the Marina District, the building boasts a seamless connection with its surroundings. Within, […]

Panera Bread Detroit Renaissance Center

This tenant improvement project  was a 6,457 s.f. build-out located inside the Detroit Renaissance Center in the Wintergarden Area.  This space previously consisted of 4 different spaces that were not as-built or coordinated. The space consisted of seating areas, cooking line, catering area and restrooms. Work consisted of metal studs and drywall, in wall mechanical and electrical and […]

Westfarms Regional Mall

This project includes replacement of two mall entrances, renovation and re-configuration of seven mall anchor courts, interior renovations throughout the mall and site signage upgrades throughout the popular Westfarms Mall. Renovations of the 15,000 sq.ft. Grand Court includes a new glass enclosed elevator and state of the art customer service desk. Communication and coordination where critical […]

Shops at Willow Bend

The project included demolishing the existing Lord & Taylor building, constructing an addition for Restoration Hardware, preparing a foundation for Crate & Barrel, and building an outdoor plaza.

Stony Point Cinebistro

The project involved demolishing a section of the existing lifestyle center, creating a foundation for a new theater, renovating an existing structure, and redesigning the current plaza to accommodate new layouts.

Northville Village Center

Situated between 6 Mile Road and 7 Mile Road at Cross Road in Northville, Northville Village Center is the focal point of this endeavor. The project encompassed several aspects, comprising the establishment of 28,000 sq.ft. of retail shell space, along with 10,000 sq.ft. for the complete build-out of Pier 1 Imports and 3,000 sq.ft. for […]

Fairlane Town Center Renovations & Plaza Addition

The project entailed the removal of an existing anchor store, followed by the construction of a new mall entrance and plaza zone, encompassing sitework and utilities. Employing a swift-track approach, the initiative was successfully completed within the designated timeframe, achieving a remarkable 2% under-budget outcome.