Swartz Creek Community Schools Performing Arts Center

A new Performing Arts Center measuring 48,000 sq.ft. was built on the west side of the existing high school. The center features a 650-seat auditorium equipped with an orchestra pit. Backstage, there’s a 1,500 sq.ft. scene shop, two major dressing rooms, storage spaces, and additional support areas. Furthermore, specialized classrooms were dedicated to band, choir, […]

Fowler Public Schools

The project was conducted in two phases and encompassed the following: Fowler High School: Addition of a new administration wing Construction of a gymnasium and locker room addition Renovation of the main concourse Revamping of the fitness center Overhaul of the auxiliary gymnasium Site improvements for enhanced functionality Waldron School: Construction of a new west […]

Lenawee Intermediate School District

In Phase I of this project, a 5,000 sq.ft. laboratory and classroom building was constructed for the district’s career-technical education program. The primary aim was for the building to achieve net zero energy consumption. The project’s Net Zero Energy goal encompassed various sustainable features including geothermal systems, green roof installations, thermal solar technology, and more. […]

Airport Community Schools 2011 Bond Program

The 2011 bond program encompassed several key projects, including minor renovations to four elementary school buildings, site paving, and miscellaneous site work. Additionally, there were mechanical and architectural renovations at the middle school, a three-classroom addition at the high school, and renovations at the high school itself. Clark Construction’s K-12 team played an integral role […]

Swartz Creek Community Schools

Swartz Creek Schools partnered with Clark Construction Company to assess their current facilities and future requirements. The district encompasses five elementary buildings, a Middle School, a High School, and a facility housing a Childhood Development Center, Special Education, and Alternative High School. These structures are all set to be included in an upcoming bond program. […]

Lincoln Consolidated Schools 2010 Bond Program

Overall bond work included renovations to all 10 buildings within the District and additions to 3 buildings. The majority of the work was completed during the summer of 2011. Scope of work included: Brick Elementary School/Lincoln Multi Age: Renovations to original 160,000 sq.ft., 3-story structure (built in 1923), includes replacement of ceiling tile/grid, doors, door frames, […]

Detroit Public Schools East English Village Preparatory Academy

As part of the 2009 Bond Program, the existing Finney High School was replaced by a new 221,000 sq.ft. High School on the same site, designed to accommodate up to 1,200 students. The state-of-the-art facility boasts four wings housing eight science laboratories, an advanced media center, an athletic area featuring a community health clinic, and […]

Milan Area Schools 2009 Bond Program

The initial work required a massive amount of construction completed during the 2010 summer break.  The balance of construction was complete by September, 2011.  Scope of work included: Symons Elementary School – Replaced roofing and windows, renovated staff and student toilet rooms, replaced fire alarm system, replaced mechanical/electrical equipment and installed technology infrastructure. Paddock Elementary Schools – Replaced heating and […]

Greenville Public Schools

Clark Construction provided pre-bond assistance to the Citizens’ Committee and District Administration for their 2011 bond program. Scope of work for the construction phase included: Elementary Buildings Improved site safety, circulation and parking Building security improvements Wireless connectivity technology Building entry improvements Carpet replacement with asbestos removal Installation of air conditioning at one location Greenville […]

Grand Ledge Public Schools

Renovation and upgrades at 10 separate district buildings; scope of work included: District wide replacement and upgrade of existing heating, cooling and ventilation systems Multiple chiller installations Modification of existing AHUs and conversion from DX to chilled glycol systems Boiler installation and replacement of fin tube and modular type systems Conversion of existing BMS to […]