Alma High School

High School upgrades and renovations including: Storage room addition Remodel pool area Science labs Auditorium Toilet rooms Kitchen Gym bleachers Replacement of roof, windows, select ceilings, exterior entrances, PA and clock system Upgrades to security systems, mechanical units and controls, and electrical infrastructure Replace entry plaza Replace running track and visitor bleachers Clark Construction’s K-12 […]

Waverly Community Schools 2000 Bond Program

Clark was the Construction Manager for this $54 million bond program consisting of nine separate buildings as well as athletic fields. The scope of work included district-wide improvements plus some building additions including: High School 40,000 s.f. addition and complete renovation of the existing 220,000 s.f. building. Sitework improvements include renovation of the running track […]

Fowler Public Schools Bond Program

Clark Construction Company played a pivotal role as the Construction Manager for Fowler’s $2.1 million project. The project encompassed various key aspects, including additions and renovations to the Elementary School, enhancements to the High School Science Room, and the creation of a dynamic High School Media Center with modernized facilities. Additionally, the project involved the […]

Fowlerville Community Schools

High School (conversion of existing Jr. High to High School) 150,000 sq.ft. addition of classrooms, industrial arts areas, auditorium and competition gymnasium, including lobby and circulation spaces. Site circulation enhancements and renovations; site athletics improvements including fields, lighting and concession areas; equipment and technology upgrades. Jr. High School (conversion of High School to Jr. High School) […]

Howell Public Schools Howell High School Renovation

The Howell High School Renovations project encompassed a comprehensive scope of work. Notable highlights included the installation of a synthetic turf football field and the construction of a new 8,000 sq.ft. athletic team room building, complete with stadium concessions. A substantial 15,000 sq.ft. addition with a 2-story entrance was introduced, while the existing 434,947 sq.ft. […]

Durand Area Schools 2006 Bond Program

This project included the following: Bertha Neal Elementary: Parking, drainage and vehicle circulation improvements; renovations relative to ADA compliance; Mechanical, Electrical and Finish upgrades Doyle Knight Elementary: Parking, drainage and vehicle circulation improvements; renovations relative to ADA compliance; Mechanical, Electrical and Finish upgrades Robert Kerr Elementary School: Parking, drainage and vehicle circulation improvements; renovations relative […]

East Lansing Public Schools 2008 Bond Program

The Clark Educational Team assisted East Lansing with pre-bond activities including cost estimating, scheduling, and presentations at community forums.  Scope of work for the bond program is outlined below: East Lansing High School Major renovation of existing 150,000 sq.ft building, including HVAC system replacement.  This was a phased renovation and addition project and included construction of a new […]

Lansing School District Pattengill Middle School

The project involved the construction of a new 175,000 sq.ft. Middle School alongside athletic fields and support spaces. The school’s design was modeled after a prototype developed by GMB Architects-Engineers, tailored for urban settings. Additionally, a 27,000 sq.ft. Performing Arts Addition was seamlessly integrated into the new building, accommodating a 750-seat auditorium with dressing rooms, […]

Webberville Community Schools

2004 Bond Program 51,000 s.f. addition to the Jr. High/High School building; gymnasium with locker rooms, weight room, wrestling and aerobics room; new 5,000 s.f. Agricultural Building; new bleachers; Community Health Center; improved site circulation. 2002 Bond Program 8,500 s.f. addition of Media Center, science room, and specialty classroom; new track with events area, fencing, bleachers, and landscaping; 9,700 s.f. […]

Alma Public Schools 2004 Bond Program

This project included: New Middle School: 115,000 s.f. – included auditorium, gymnasium, library, science labs, parking lots, sidewalks, and landscaping Luce Road Elementary: 14,250 s.f. new construction – classroom and office addition Renovations – upgrade kitchen, replace windows, electrical improvements, site improvements Hillcrest Elementary: 5,235 s.f. new construction – library/media center; administrative office. Renovations – […]