Archives

Central Michigan University McGuirk Arena/Student Events Center

Central Michigan University’s Student Events Center underwent a comprehensive transformation, enhancing the existing basketball arena while ensuring seamless functionality during all three phases of the project. This intricate endeavor included renovating and expanding the Basketball Arena within the constraints of an occupied and operational facility. A unique seating structure was implemented using an engineered Metal […]

Madonna University Franciscan Center

Madonna University’s innovative 64,000-square-foot building, envisioned by the SmithGroup, encompasses a range of cutting-edge facilities. Nine advanced laboratories, complemented by 13 support rooms, foster scientific exploration, while a high-tech lecture hall accommodating 156 seats facilitates immersive learning. The building houses an all-digital television production studio, radio production studios, video editing labs, classrooms, and conference rooms, […]

University of Michigan Kellogg Eye Center Expansion/Brehm Diabetes Research Tower

Situated to the west of the existing Kellogg Eye Center Building, the University of Michigan Hospital Eye Center Expansion project encompasses a clinical and research tower. This development facilitates the growth and operational needs of the Department of Ophthalmology and Visual Sciences, along with the Brehm Center for Type 1 Diabetes Research and Analysis. The […]

University of Michigan Stephen M. Ross School of Business

This new state-of-the-art building is 270,000 sq.ft. with six floors (with 12 classrooms per floor), a 500-seat auditorium and colloquium, faculty offices, student service activities space and a central gathering space that provides seating areas and a food court. Project elements include an enclosed glass winter garden (which is the center of the collaborative learning community), […]

Lansing Board of Water and Light – Central Substation

The new Central Substation was built to remove approximately 51 MVA of load from the existing Eckert Substation in anticipation of the retirement of the Eckert generating station in the future. The design included 138 kV six position breaker-and-a-half scheme with three transformer positions and three line terminal positions. The transformers are 138-13.8 kV 18/24/30 […]

MSU – Edward J. Minskoff Pavilion

The Edward J. Minskoff Pavilion, is a state-of-the-art facility covering 100,000 square feet. It will cement MSU’s position as a top-of-mind business school, and will enhance the Broad student experience through its design around community, collaboration and teamwork. Higher education as we know it is changing, and this structure will position the Broad College ahead […]

McLaren Central Michigan Emergency Room Expansion and Renovation

Undertaken in Mt. Pleasant, the McLaren Central Michigan endeavor encompassed the construction of an emergency room addition alongside interior enhancements to the existing emergency department and radiology registration spaces. Notably, this project introduced a welcoming waiting room with multiple seating zones, augmented by the inclusion of 16 spacious and secluded patient rooms, two expanded trauma […]

Sparrow Health System Medical Office Building

This project featured the development of a 3-story Medical Office Building on the existing Sparrow site at 2909 E. Grand River Ave. The site’s previous occupant, the Medical Dental Building, underwent abatement and demolition. The facility now accommodates diverse tenants, including SMG North, SMG Eastside, Senior Services, Physical Therapy, Endoscopy, a comprehensive Imaging Center (incorporating […]

Capitol View Michigan State Senate Office Complex Renovation

This project entailed the reconfiguration and renovation of existing office spaces across floors 1-7 within the Capitol View Office Complex, ultimately designated to house the offices for the Michigan State Senate. While the transformation unfolded, floors 8 and 9 remained operational. The endeavor also encompassed the establishment of new Committee Rooms, a striking 2-Story Lobby, […]

Beaumont Health System – Troy Phased Powerhouse Expansion

The Clark team at the Beaumont Health – Troy Campus accomplished the assembly of the new Powerhouse project. This included the installation of three sizeable CAT generators – 1500KW and 2000KW each – facilitated through removable steel roof monitors positioned on the roof structure. The generator exhaust stacks were thoughtfully directed through an eight-story exhaust […]